Gillette Distribution Centre, Reading

A low-maintenance, self-balancing JET air induction system for a new 151,680 m³ warehouse, holding temperatures above +10°C for aerosols, razor blades, electrical equipment and batteries.

Client
Gillette
Floor area
10,112 m²
Installed heater load
600 kW
Commissioning, down from weeks
Hours

The brief: the right climate for aerosols, razor blades, electricals and batteries

After increasing capacity at its distribution centre on the Manor Farm Industrial Estate in Reading with another purpose-built warehouse, Gillette tackled the question of heating — specifically, which kind of HVAC solution would best suit the storage of aerosol products, razor blades, electrical equipment and batteries in a facility owned and managed by logistics specialists Tibbett & Britten.

  • A closely controlled environment was needed, with temperatures held above +10°C
  • The temperature had to support the microbiology hold process required by certain products before despatch to retail, and provide frost protection
  • A low-maintenance system was needed to keep the new 151,680 m³ facility running smoothly, without disrupting operations
  • The design had to work around an ESFR sprinkler system, lighting, high-level smoke sensors and high-bay racking reaching 11.6 m

The solution: a self-balancing air induction system, designed with CFD

After researching a number of potential solutions, Gillette's project director opted for a low-maintenance JET air induction system, specified by M&E contractor Howvale Building Services. JET used its logistics sector expertise to design an energy-efficient, self-balancing system for Gillette's diverse requirements, taking a whole-life view of the development.

  • Advanced computational fluid dynamics (CFD) used to evaluate heating and ventilation requirements before the system was designed
  • Self-balancing by design — no dampers in the ductwork or at the outlets, and no access to the operational space needed for maintenance
  • 1 direct gas-fired system with a 600 kW installed heater load and 8.38 m³/s supply air volume
  • Co-ordinated around the ESFR sprinklers, lighting, smoke sensors and 11.6 m high-bay racking

What the system delivered

Controlled environment

Temperature is maintained above +10°C, supporting the microbiology hold process and providing frost protection.

No maintenance access

With no dampers to adjust, no access to the operational space is required, and no downtime needs to be built into the facility management programme.

Commissioning in hours

Installation was fast-tracked and commissioning shortened from weeks to a matter of hours, reducing on-site costs.

On time, on budget

Delivered with principal contractor SBH and M&E contractor Howvale Building Services, eliminating administrative costs along the way.

What the project team said

"JET worked in conjunction with the principal contractor SBH and the M&E contractor Howvale Building Services to bring the project in on budget and on time, while also eliminating costs in the administrative process to deliver real value to Gillette."

Operations Manager, Tibbett & Britten

"The nature of this building and Gillette's definitive product storage requirements demands a closely controlled environment. JET's solution ensures the temperature is maintained above +10°C, which aids the microbiology hold process required by certain products before they can be despatched for retail, and provides frost protection."

Operations Manager, Tibbett & Britten

"Our solution meets Gillette's specific building and application criteria and affords the company tangible productivity benefits. The system is self-balancing so there are no dampers in the ductwork or at the outlets which would need to be adjusted on a regular basis, and no access is therefore required to the operational space for maintenance."

Technical Director, JET

About Gillette and Tibbett & Britten

The Gillette Company

Founded in 1901, Gillette was the global market leader in the grooming, portable power and oral care sectors, with 34 manufacturing operations in 15 countries and distribution to more than 200 countries and territories. Its portfolio of world-class brands included Duracell Ultra batteries, Braun electric shavers and Oral B toothbrushes.

Tibbett & Britten

Tibbett & Britten, which owns and manages the Reading facility, was one of the world's top ten logistics and supply chain management companies, working under long-term contract for major retailers and multinational manufacturers in 33 countries. Its business spanned conventional logistics and e-commerce support for household names including Tesco, Carphone Warehouse, Marks and Spencer, Gillette, Cadbury-Schweppes and Unilever.

Inside and out

Show technical specifications
Building & design criteria
LocationManor Farm Industrial Estate, Reading
Length128 m
Width79 m
Eaves height13 m
Ridge height17 m
Average height15 m
Floor area10,112 m²
Volume151,680 m³
Internal design temp.10°C
External design temp.-2°C
System
Number of units / systems1 no.
Heater typeDirect gas fired
Installed heater load600 kW
Supply air volume8.38 m³/s
DistributionSelf-balancing air induction system
Racking height11.6 m
Project team
ClientGillette
Facility owner / operatorTibbett & Britten
Principal contractorSBH
M&E contractorHowvale Building Services
HVAC design & installationJet Environmental

From frost protection to multi-zone climate control, our engineers design bespoke HVAC systems that perform. If you have a facility with a similar problem, talk to us about it.