Confectionery · Logistics & Warehousing · Derby, Midlands ·DHL Supply Chain

Project Triathlon: four climate zones, one roof

Four independently governed zones — temperature, humidity and biosecurity pressure — held to spec across a single storage and co-packing facility, year round.

Client
DHL Supply Chain
Warehouse floor area
62,400 m²
Total cooling duty
2,444 kW
AHUs integrated
7

Project Triathlon sets a new standard in precision environmental management for the confectionery logistics sector. Jet Environmental delivered a fully integrated solution encompassing temperature, humidity, and pressure control across four distinct warehouse zones, each with unique operational requirements. Main contractor Winvic Construction completed the facility in September 2021, and it remains one of Jet's flagship sites: we still maintain it today.

The system combines seven balanced JET induction units, advanced humidity regulation, and biosecurity pressure management — all orchestrated by a central chilled-water plant and intelligent Trend automation. The result is year-round product protection, regulatory compliance, and significant energy efficiency gains.

Confectionery is fragile cargo. Too warm and it sweats and blooms; too humid and it draws moisture and spoils; let air drift the wrong way between a returns store and a co-packing line and you risk cross-contamination that fails a food-safety audit. This facility had all of those risks in one building — and four areas that each needed a different answer.

The brief was not "cool the warehouse." It was to hold four distinct zones, simultaneously, at their own temperature, their own humidity, and their own air pressure — and to keep them there whatever the weather did outside.

The challenge: one building, four different climates

The facility required rigorous control of temperature, humidity, and air pressure to safeguard sensitive confectionery products while maintaining optimal working conditions. A single roof covered high-bay racking, low-bay storage and marshalling, a taint store for returned and quarantined goods, and a first-floor co-packing mezzanine. Each had its own job, and each needed its own conditions — including, in the taint store, negative pressure to keep any contamination contained rather than letting it drift into product.

  • Maintain precise temperature control (±1°C) across all zones year-round
  • Achieve independent humidity regulation for each product storage area
  • Establish biosecurity pressure differentials to prevent cross-contamination
  • Deliver an energy-efficient, future-ready modular system
ZoneAreaSystemsConditions
Zone 1High-bay racking3 JET internal AHUs15°C winter / 22°C summer, 55% RH, positive pressure
Zone 2Low-bay racking / marshalling / ground-floor mezzanine2 JET external AHUs15°C / 22°C, 50% RH, neutral pressure
Zone 3Taint store1 JET external AHU15°C / 22°C, 45% RH, negative pressure (biosecurity)
Zone 4First-floor co-pack mezzanine1 JET internal AHU15°C / 22°C, 50% RH, positive pressure

The solution: seven systems working as one

Jet Environmental designed a bespoke multi-zone architecture combining seven balanced JET induction systems with dedicated Air Handling Units, a central chilled-water plant, and intelligent Trend automation. Warm and chilled water is distributed to zone-specific AHUs, each integrating bag and panel filtration, modulating gas-fired heaters, cooling coils, and humidity control modules. High-velocity nozzles fed by medium-velocity ductwork give uniform conditions with no moving parts in the distribution itself, and nothing at high level to maintain.

Air handling

Each air handling unit carries bag and panel filtration, chilled-water cooling coils, modulating gas-fired heating, a humidity-control module, and run/standby supply fans so a single fan fault never takes a zone offline.

Humidity, held per zone

Every zone has its own humidity sensing and modulating humidification and dehumidification, so each area sits at the relative humidity its product and process actually need — not a single building-wide compromise.

Biosecurity by pressure

Pressure differentials are actively managed to stop air — and anything in it — moving the wrong way. Negative pressure in the taint store contains returned and tainted goods; positive pressure across storage and co-packing protects product integrity. This is biosecurity engineered into the airflow, not bolted on afterwards.

Plant and control

A central plant of four Daikin R32 air-cooled water chillers — 2,444 kW of cooling duty, with multi-circuit compressors, primary and standby pumps, automatic water treatment, and an insulated buffer tank — feeds the whole system, alongside 2,025 kW of indirect gas-fired heating. Fabric sock distribution carries 104 m³/s of air across the zones. A Trend standalone control system, by AES Ltd, monitors every parameter in real time, adjusts automatically, and supports remote diagnostics, so the building effectively tunes itself and can be checked without a site visit.

Measurable outcomes

Year-round consistency

Stable temperature and humidity conditions maintained regardless of seasonal or external fluctuations, ensuring product quality and staff comfort.

Biosecurity assurance

Pressure differentials actively managed to mitigate contamination risks, supporting stringent food safety standards across all zones.

Energy efficiency

Modular design and intelligent controls optimise energy use with built-in capacity for future expansion and adaptation.

Operational excellence

Low-maintenance reliability, full adaptability, and compliance with industry best practices and regulatory requirements. And because Jet still maintains the site, the system is looked after by the team that designed it.

What the client said

"Jet Environmental Systems delivered an outstanding environmental control solution for our project. Their technical expertise, attention to detail, and ability to provide a sustainable multi-zone system that performs reliably in challenging conditions has been invaluable to our operations."

Project Director, DHL Supply Chain

At a glance

FeatureSpecification
ClientDHL Supply Chain
Main contractorWinvic Construction
CompletedSeptember 2021
Building260 m × 240 m, 31 m average height
Floor area62,400 m²
Volume1,934,400 m³
Balanced JET systems7
Air handling units7 (internal & external), run/standby fan sets
Total airflow104 m³/s
HeatingIndirect gas-fired, 2,025 kW total output
Chillers4 × Daikin R32 air-cooled water chillers, 2,444 kW total duty
Humidity controlZone-specific humidification / dehumidification
Pressure controlPositive / neutral / negative by zone
Temperature range15°C (winter) / 22°C (summer)
ControlTrend standalone automation system (AES Ltd)
Zones covered4

This project demonstrates how businesses can integrate sustainable, precision environmental control in large-scale facilities. The modular, future-ready design ensures ongoing adaptability and value for stakeholders across multiple sectors: warehousing and logistics, food and beverage, cold chain and cold storage, manufacturing and pharmaceutical. If your building is asking more of its climate than an off-the-shelf system can give, that is the conversation to have.